Remodel Timeline
Limited-Service Period:
- October 4 (Sat) – October 18 (Sat)
Only drive-up teller window and exterior ITMs available
Closed on Sunday, October 19
Full-Service Inside:
- October 20 (Mon) – October 25 (Sat)
All services available except drive-up teller window
Closed on Sunday, October 26
Branch Closure:
- October 27 (Mon) – October 29 (Wed)
Only exterior ITMs available
Closure due to onsite training and security installation
Full-Service Reopening:
- Thursday, October 30
Please Note
Safe Deposit Box Access
No access during limited-service period (10/4–10/19) and branch closure (10/27–10/29)
Access available during full-service inside period (10/20–10/25)